FR | EN

DOCUMENTS

2018

TECHNICAL REPORT ON THE MONEXCO PROPERTY

The entitled report ” Technical Report on the Monexco Property,McCorkill Township, Chibougamau, Qu├ębec ”, concluded two years of exploration and evaluation works done on the property.

2015

PRELIMINARY ECONOMIC ASSESSMENT STUDY (PEA)

A Positive Preliminary Economic Assessment Study (PEA) was completed on the Fayolle Deposit in 2013. A Preliminary Metallurgical Study of the gold recovery rate was completed in 2012 on the Fayolle Deposit and indicated an average gold recovery rate of more than 96%.

2015

MINERAL RESOURCE ESTIMATE

An updated Mineral Resource Estimate for the Fayolle Deposit was completed by InnovExplo Inc.(43-101 / September 2012).The mineral resources were upgraded from the infered to the indicated category.

2015

PRELIMINARY METALLURGICAL STUDY

A Preliminary Metallurgical Study of the gold recovery rate was completed in 2012 on the Fayolle Deposit and indacated an average gold recovery rate of more than 96%.

2015

SUSTAINABLE DEVELOPMENT POLICY

Sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs.

2015

POWERPOINT

A .PDF version of our corporate PowerPoint presentation, which covers topics ranging from financial details to information about our Directors and activity on our Properties.

2015

POWERPOINT Typhoon/Hecla (Fayolle)

A .PDF version of the Typhoon/Hecla PowerPoint presentation which focuses on the Fayolle Property.

2015

CORPORATE PROFILE

Typhoon’s Corporate Profile covers topics ranging from financial details to information about our properties.